Sandy Neck Light which has been without its lantern room since 1933.
First job was to install the stanchions which would later house the glass.
The cast roof sections were brought to the top of the tower and then assembled in place one by one.
More roof sections in place.
Final piece being bolted in place.
Dana inspecting things from the top.
Painting the roof with a two part paint.
Lantern room assembled and ready to receive the glass at a later date.