|
Main Page |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Job # |
Location |
Description |
Comments |
Technical |
Priority
(1-5) |
Pictures |
Size
(1-10) |
Status |
Proposal |
|
| 100 |
Building A |
Patch Elevator machine room
ceiling hole. Install Inspection Hatch |
Complete prior to inspection on
8/22/09 |
|
|
|
|
|
|
|
|
Complete |
|
|
| 101 |
Building A |
Main room and associated rooms
have cracks in the walls and worn / damaged paint |
Repair cracks and redecorate
rooms |
|
5 |
1 |
|
|
|
|
8 |
Pending |
|
|
| 104 |
Building A |
Down spouts and gutters require
attention |
Missing, rotted, blocked. |
|
2 |
|
|
|
|
|
6 |
Identified |
|
|
| 107 |
Building A |
Rotted door trim on basement
entrance |
Replace and repair as necessary |
|
3 |
|
|
|
|
|
3 |
Identified |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|