Job # Location Description Comments Technical Priority (1-5) Pictures Size (1-10) Status Proposal
100 Building A Patch Elevator machine room ceiling hole. Install Inspection Hatch Complete prior to inspection on 8/22/09 Rounded Rectangular Callout: Click here to see breakdown of categories
10" X 12"
              Complete  
101 Building A Main room and associated rooms have cracks in the walls and worn / damaged paint Repair cracks and redecorate rooms   5 1         8 Pending  
104 Building A Down spouts and gutters require attention Missing, rotted, blocked.   2 Rounded Rectangular Callout: Click here to see picture. Use browser back button to return from picture.
1
        6 Identified  
107 Building A Rotted door trim on basement entrance Replace and repair as necessary   3           3 Identified